Examination Library

This examination library provides access to all supporting evidence and technical assessments relevant to the submitted Local Plan.

The examination is being conducted under the transitional arrangements set out in the National Planning Policy Framework (NPPF) 2018/ 19 (Para. 214). This means that Government policy and guidance is as detailed in the NPPF 2012 and the associated Planning Practice Guidance (PPG) 2014.

NPPF 2012 is available below as a ‘Main Submission Document’.

The PPG is published in an on-line website format. The relevant 2014 version is now available only in the National Archive. It can be accessed via the link below.

Planning Practice Guidance (PPG) 2014

All documents relating to the Examination in Public and the hearing sessions can be found on the Examination Session and Documents page, which will be updated as the examination progresses.

Hard copies of Tandridge District Council published documents are available for a fee and can be ordered by filling in our Contact Us form or calling 01883 722000. Documents can be collected from the Council Offices or posted on request (you will need to pay for the postage).

ECO1 - Tandridge Local Plan 2016 Site Based Ecological Assessments Rebuttals and Responses to Promoter Representations 2018

ECO2 - Tandridge Local Plan Site Based Ecology Assessments Volume 1 Main Report 2018

ECO3 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Appendices 2018

ECO4 - Tandridge Local Plan 2033 Air Quality Impact Assessment Specific attention on the Garden Village Schemes 2018

ECO5 - Tandridge Local Plan Site Based Ecology Assessments Volume 1 Main Report 2017

ECO6 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Appendices 2017

ECO7 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Blindley Heath Bletchingley Caterham 2017

ECO8 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Domewood Dormansland Dormans Park Felbridge 2017

ECO9 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Godstone Lingfield Nutfield Oxted 2017

ECO10 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 South Godstone Smallfield Warlingham 2017

ECO11 - Ecological Appraisals of Potential Garden Village Locations Tandridge and Adjoining Authorities 2017

ECO12 - Tandridge Local Plan Site Based Ecology Assessments Volume 1 2016

ECO13 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 2016

ECO14 - Tandridge Local Plan Site Based Ecology Assessment Volume 2 Blindley Heath Bletchingley and Caterham 2016

ECO15 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Domewood and Dormansland 2016

ECO16 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Employment Needs Analysis 2016

ECO17 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Felbridge Godstone Lingfield and Nutfield 2016

ECO18 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Oxted 2016

ECO19 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 South Godstone and Smallfield 2016

ECO20 - Tandridge Local Plan Site Based Ecology Assessments Volume 2 Warlingham and Whyteleafe 2016

HNS1 - Tandridge Housing Strategy 2019-2023 2019

HNS1E - Tandridge Housing Strategy 2019-2023 Feb 2019

HNS2 - Tandridge Local Plan 2033 Housing Topic Paper 2019

HNS3 - Tandridge Brownfield Register 2018

HNS4 - Tandridge Brownfield Register Maps 2018

HNS5 - Updating the Objectively Assessed Housing Needs of Tandridge 2018

HNS6 - Regulation 19 Housing Topic Paper 2018

HNS7 - Regulation 19 Housing Topic Paper Addendum 2018

HNS8 - Authority's Monitoring Report 2018

HNS9 - Review of Inspectors' Decisions on SHMAs and OAN for Tandridge Updated 2018

HNS10 - Addressing the Needs of All Household Types for Tandridge Updated 2018

HNS11 - Affordable Housing Needs Assessment for Tandridge Updated 2018

HNS12 - Analysis of Market Signals for Tandridge Updated 2018

HNS13 - Defining the Housing Market Area for Tandridge Updated 2018

HNS14 - Balancing Homes and Job Requirements in the Local Plan Part A Balancing the Number of Homes and Jobs 2016

HNS15 - Balancing Homes and Job Requirements in the Local Plan Part B Reducing the Loss of Good Quality Employment Stock 2016

HNS16 - Tandridge District Strategic Housing Market Assessment SHMA 2015

HNS17 - Addressing the Needs of All Household Types for Tandridge 2015

HNS18 - Affordable Housing Needs Assessment for Tandridge 2015

HNS19 - Analysis of Market Signals for Tandridge 2015

HNS20 - Defining the Housing Market Area for Tandridge 2015

HNS21 - Review of Inspectors' Decisions on SHMAs and OAN for Tandridge 2015

HNS22 - The Objectively Assessed Housing Needs of Tandridge 2015

HNS23E - Calculations to reflect 2016 based household projections

HNS24E - Housing Delivery Test Action Plan 2019

HNS25E – Housing Delivery Test Action Plan Addendum 2019

INF1 - Tandridge District Infrastructure Delivery Plan 2019

INF2 - Tandridge District South Godstone Garden Community Financial Viability Assessment 2018

INF3 - Felbridge Junction Feasibility Assessment Note 2018

INF4 - Tandridge District M25 Junction 6 Briefing Note 2018

INF5 - Tandridge District Copthorne Hotel Junction Feasibility 2018

INF6 - Tandridge District Copthorne Hotel Junction Feasibility Appendix A 2018

INF7 - Tandridge District Copthorne Hotel Junction Feasibility Appendix B 2018

INF8 - Tandridge District Copthorne Hotel Junction Feasibility Appendix C 2018

INF9 - Tandridge District Copthorne Hotel Junction Feasibility Appendix D 2018

INF10 - Annex to the Tandridge District Strategic Highways Assessment 2018

INF11 - Tandridge District Infrastructure Delivery Plan 2018

INF12 - Tandridge District Strategic Highway Assessment Mitigation 2018 

INF13 - Tandridge District Playing Pitch Strategy and Action Plan 2018

INF14 - Tandridge District Playing Pitch Strategy Assessment Report 2018

INF15 - Tandridge Draft Local Plan Viability Assessment 2018

INF16 - Tandridge District Strategic Highway Assessment Scenarios 2A F 2018

INF17 - Surrey Infrastructure Study Part 1 2017

INF18 - Surrey Infrastructure Study Part 2 2017

INF19 - Surrey Infrastructure Study Part 3 2017

INF20 - Tandridge Local Plan Transport and Accessibility Assessment of Potential Garden Village Locations 2017

INF21 - Gatwick Diamond Local Strategic Statement 2017

INF22 - Gatwick Diamond Post 2030 Infrastructure Study 2016

INF23 - Surrey Infrastructure Study 2016

INF24 - Tandridge District Infrastructure Delivery Plan Baseline Part 1 2015

INF25 - Tandridge District Infrastructure Delivery Plan Baseline Part 1 Appendix 2015

INF26 - Tandridge District Infrastructure Delivery Plan Baseline Part 2 2015

INF27 - Tandridge District Infrastructure Delivery Plan Baseline Part 2 Appendix 2015

INF28 - Tandridge District Strategic Highway Assessment 2015

INFE29 - Junction 6 Mitigation Note

INFE30 - CCG Estates Plan

INFE31 – Felbridge Junction Executive Summary

INFE32 – Smallfield Options and Appraisal Report September 2019

LAN1 - Notes on Tandridge Landscape Capacity and Sensitivity Study Rebuttals 2017

LAN2 - Tandridge Landscape Capacity and Sensitivity Study Rebuttal Notes 2017

LAN3 - Tandridge Landscape Capacity and Sensitivity Study Addendum 2017

LAN4 - Tandridge Landscape Capacity and Sensitivity Study Addendum A 2017

LAN5 - Tandridge Landscape Capacity and Sensitivity Study Addendum B 2017

LAN6 - Tandridge District Landscape and Visual Assessment Concept Areas for New and Extended Settlements 2016

LAN7 - Tandridge Landscape Capacity and Sensitivity Study Intro and Warlingham 2016

LAN8 - Tandridge Landscape Capacity and Sensitivity Study Bletchingley 2016

LAN9 - Tandridge Landscape Capacity and Sensitivity Study Blindley Heath 2016

LAN10 - Tandridge Landscape Capacity and Sensitivity Study Burstow 2016

LAN11 - Tandridge Landscape Capacity and Sensitivity Study Caterham on the Hill 2016

LAN12 - Tandridge Landscape Capacity and Sensitivity Study Caterham Valley 2016

LAN13 - Tandridge Landscape Capacity and Sensitivity Study Dormansland 2016

LAN14 - Tandridge Landscape Capacity and Sensitivity Study Felbridge 2016

LAN15 - Tandridge Landscape Capacity and Sensitivity Study Godstone 2016

LAN16 - Tandridge Landscape Capacity and Sensitivity Study Lingfield 2016

LAN17 - Tandridge Landscape Capacity and Sensitivity Study Oxted North 2016

LAN18 - Tandridge Landscape Capacity and Sensitivity Study Oxted South 2016

LAN19 - Tandridge Landscape Capacity and Sensitivity Study Smallfield 2016

LAN20 - Tandridge Landscape Capacity and Sensitivity Study South Godstone 2016

LAN21 - Tandridge Landscape Capacity and Sensitivity Study South Nutfield 2016

LAN22 - Tandridge  Landscape Capacity and Sensitivity Study Whyteleafe 2016

LAN23 - Tandridge Landscape Capacity and Sensitivity Study Overview Map 2016

LAN24 - Tandridge Landscape Sensitivity and Value Criteria For Determining Landscape Capacity for Development 2016

LAN25 - Surrey Landscape Character Assessment Tandridge District 2015

LAN26 - Surrey Landscape Character Assessment Tandridge Character Area 2015

LAN27 - Surrey Landscape Character Assessment Figures 1-9-2015

LAN28 - Surrey Landscape Character Assessment Figures 10-11-2015

LAN29 - Surrey Landscape Character Assessment Appendix 1 2015

LAN30 - Surrey Hills AGLV Review 2007

LANE31 - Surrey AGLV Review 2007 Appendix 1: Field Sheets

LANE32 - Surrey AGLV Review 2007 Appendix 2: Maps

LANE33 - Surrey AGLV Review 2007 Appendix 3: Photos

SAD1 - Housing and Economic Land Availability Assessment Interim Report 2019

SAD2 - Garden Community Delivery Approaches Briefing Note 2018

SAD3 - Housing and Economic Land Availability Assessment 2017-2018

SAD4 - Housing and Economic Land Availability Assessment 2017-2018 Appendix 1 Acronyms Used

SAD5 - Housing and Economic Land Availability Assessment 2017-2018 Appendix 2 Viability Report

SAD6 - Housing and Economic Land Availability Assessment 2017-2018 Appendix 3 Deliverable and Developable Sites

SAD7 Housing and Economic Land Availability Assessment 2017-2018 Appendix 4 Unsuitable and Unavailable Sites (Formerly uploaded as SAD19)

SAD8 - Housing and Economic Land Availability Assessment 2017-2018 Appendix 5 Tandridge Landowner Survey 2016

SAD9 - Housing and Economic Land Availability Assessment 2017-2018 Appendix 6 Employment Sites

SAD10 - Housing and Economic Land Availability Assessment 2017-2018 Appendix 7 Traveller Sites

SAD11 - Housing and Economic Land Availability Assessment 2017-2018 Appendix 8 Additional Sites for consideration

SAD12 - Tandridge District Landscape and Visual Assessment for Potential Garden Village Location 2017

SAD13 - Interim Focused Housing and Economic Land Availability Assessment Broad Locations 2017

SAD14 - Tandridge District Council Gypsy and Traveller Accomodation Assessment 2017

SAD15 - Housing and Economic Land Availability Assessment 2016

SAD16 - Housing and Economic Land Availability Assessment 2016 Appendix 1 Acronyms Used

SAD17 - Housing Economic Land Availability Assessment 2016 Appendix 2 Viability Report

SAD18 - Housing Economic Land Availability Assessment 2016 Appendix 3 Deliverable and Developable Sites

SAD19 - Housing Economic Land Availability Assessment 2016 Appendix 4 Unavailable and Unsuitable Sites (Formerly uploaded as SAD7)

SAD20 - Housing Economic Land Availability Assessment 2016 Appendix 5 Tandridge Landowner Survey

SAD21 - Housing Economic Land Availability Assessment 2016 Appendix 6 Employment Sites

SAD22 - Housing Economic Land Availability Assessment 2016 Appendix 7 Traveller Sites

SAD23 - Housing Economic Land Availability Assessment 2016 Appendix 8 Additional sites for 2017

SAD24 - Housing Economic Land Availability Assessment 2016 Appendix 9 Addendum to HELAA

SAD25 - Housing Economic Land Availability Assessment 2015

SAD26 - Tandridge Local Plan Housing and Economic Land Availability Assessment Methodology 2015

SADE27 - Statement of Delivery - HSG01

SADE28 - Statement of Delivery - HSG03

SADE29 - Statement of Delivery - HSG06

SADE30 - Statement of Delivery - HSG011

SADE31 - Statement of Delivery - HSG012

SADE32 - Statement of Delivery - HSG013

SADE33 - Statement of Delivery - HSG014

SADE34 - Statement of Delivery - HSG015A

SADE35 - Statement of Delivery - HSG016

SADE36 – Statement of Delivery – HSG015B

SDTC1 - Statement of Common Ground Crawley Borough Council 2018

SDTC2 - Statement of Common Ground Guilford Borough Council 2018

SDTC3 - Statement of Common Ground Mid Sussex District Council 2018

SDTC4 - Statement of Common Ground Mole Valley District Council 2018

SDTC5 - Statement of Common Ground Sevenoaks District Council 2018

SDTC6 - Statement of Common Ground Surrey County Council 2018

SDTC7 - Statement of Common Ground Wealden District Council 2018

SDTC8 - Statement of Common Ground West Sussex County Council 2018

SDTC9 - Duty to Cooperate Statement Update 2018

SDTC10 - Interim Surrey Local Strategic Statement 2016-2031 2017

SDTC11 - Duty to Cooperate Statement Update 2017

SDTC12 - Duty to Cooperate Statement Update 2016

SDTC13 - Duty to Cooperate Statement Update 2015

SDTC14 - Paper Setting Out Position of the Surrey Local Strategic Statement 2015

SDTC15 -Tandridge Local Plan Duty to Cooperate Framework Scoping Statement 2014

SDTCE16 - Statement of Common Ground London Borough of Bromley Council 2019

SDTCE17 - Statement of Common Ground London Borough of Croydon Council 2019

SDTCE18 - Statement of Common Ground Reigate & Banstead Borough Council 2019

SDTCE19 - Gatwick Diamond Local Strategic Statement 2016

SDTCE20 - Surrey’s 250 Place Ambition 2019

SDTCE21 - LEP Position

SDTCE22 - Statement of Common Ground Surrey Waste Local Plan 

SDTCE23 - Statement of Common Ground Highways England 2019

SDTCE24 – Statement of Common Ground Tandridge Housing Forum 2019

SDTCE25 – Gatwick Diamond Local Strategic Statement 2016 Evidence Base Report

SDTCE26 – Statement of Common Ground West Sussex County Council Update 2019

SSHA1 - Ashdown Forest Statement of Common Ground on Recreational Impact 2019

SSHA2 - Tandridge Local Plan Sustainability Appraisal Regulation 19 Stage Volume 1 Context 2018

SSHA3 - Tandridge Local Plan Sustainability Appraisal Regulation 19 Stage Volume 2 Options Assessments 2018

SSHA4 - Tandridge Local Plan Sustainability Appraisal Regulation 19 Stage Volume 3 Effects and Conclusions 2018

SSHA5 - Tandridge Local Plan Sustainability Appraisal Regulation 19 Stage Appendices 2018

SSHA6 - Tandridge Local Plan 2033 Mole Gap to Reigate Escarpment SAC Air Quality Impact Assessment 2018

SSHA7 - Habitats Regulation Assessment for the Tandridge Local Plan 2033 and Garden Community 2018

SSHA8 - Ashdown Forest SPA Monitoring Strategy 2018

SSHA9 - Tandridge Local Plan Ashdown Forest Air Quality Impact Assessment 2018

SSHA10 - Ashdown Forest Statement of Common Ground on Air Quality 2018

SSHA11 - Habitat Regulations Assessment Stage 1 Screening Including Garden Village Options 2017

SSHA12 - Sustainability Appraisal for Tandridge District Regulation 18 Potential Garden Village Locations 2017

SSHA13 - Sustainability Appraisal of Delivery Strategy Approaches Appendix B to Agenda item 5 2017

SSHA14 - Ashdown Forest Visitor Survey 2016

SSHA15 - Habitat Regulations Assessment Stage 1 Screening Update 2016

SSHA16 - Sustainability Appraisal for Tandridge District Regulation 18 Sites Consultation 2016

SSHA17 - Habitat Regulations Assessment Stage 1 Screening 2015

SSHA18 - Sustainability Appraisal 2015 Issues and Objectives Regulation 18 2015

SSHA19 - Sustainability Appraisal Strategic Environmental Assessment Scoping Report 2015

WTR1 - Flood Risk Sequential and Exception Test 2019

WTR2 - Tandridge District Water Cycle Study Phase 3 2018

WTR3 - Tandridge District Level 2 Strategic Flood Risk Assessment 2018

WTR4 - Tandridge District Level 2 Strategic Flood Risk Assessment Detailed Site Summary Tables Appendix A 2018

WTR5 - Tandridge District Level 2 Strategic Flood Risk Assessment Catchment Summary Tables Appendix B 2018

WTR6 - Tandridge District Level 2 Strategic Flood Risk Assessment Garden Community Summary Tables Appendix C 2018

WTR7 - Tandridge District Level 2 Strategic Flood Risk Assessment Detailed Site Summary Table Appendix D CAT 007 Map 2018

WTR8 - Tandridge District Level 2 Strategic Flood Risk Assessment Detailed Site Summary Table Appendix E Caterham and Whyteleafe Map 2018

WTR9 - Tandridge District Level 2 Strategic Flood Risk Assessment Detailed Site Summary Table Appendix E Caterham on the Hill Map 2018

WTR10 - Tandridge District Level 2 Strategic Flood Risk Assessment Detailed Site Summary Table Appendix E Smallfield Map 2018

WTR11 - Tandridge District Level 2 Strategic Flood Risk Assessment Detailed Site Summary Table Appendix F Blindley Heath Map 2018

WTR12 - Tandridge District Level 2 Strategic Flood Risk Assessment Detailed Site Summary Table Appendix F Redhill Aerodrome Map 2018

WTR13 - Tandridge District Level 2 Strategic Flood Risk Assessment Detailed Site Summary Table Appendix F South Godstone Map 2018

WTR14 - Water People Places Guidance for Master Planning Sustainable Drainage 2018

WTR15 - Tandridge District Water Cycle Study Phase 2 Outline Study 2018

WTR16 - Tandridge District Water Cycle Study Phase 2 Appendix A Site Tracker Spreadsheet 2018

WTR17 - Tandridge District Water Cycle Study Phase 2 Appendix B Water Quality Assessment 2018

WTR18 - Tandridge District Water Cycle Study Phase 1 Scoping Study 2018

WTR19 - Level 1 Strategic Flood Risk Assessment 2017

WTR20 - Strategic Flood Risk Assessment Level 1 Appendix A Index Grid 2017

WTR21 - Strategic Flood Risk Assessment Level 1 Appendix B Principal Watercourses 2017

WTR22 - Strategic Flood Risk Assessment Level 1 Appendix C Areas at Risk of Flooding from Rivers Flood Zone Mapping 2017

WTR23 - Strategic Flood Risk Assessment Level 1 Appendix D Climate change impact on fluvial flood risk 2017

WTR24 - Strategic Flood Risk Assessment Level 1 Appendix E Risk of Flooding From Surface Water 2017

WTR25 - Strategic Flood Risk Assessment Level 1 Appendix F Areas at Risk of Ground Water Flooding 2017

WTR26 - Strategic Flood Risk Assessment Level 1 Appendix G Flood Alert and Flood Warning Areas 2017

WTR27 - Strategic Flood Risk Assessment Level 1 Appendix H Areas with Recorded Flood Events 2017

WTR28 - Strategic Flood Risk Assessment Level 1 Appendix I Areas with Recorded Incidents of Sewer Flooding 2017

WTR29 - Strategic Flood Risk Assessment Further Details for Tandridge District 2016

WTR30 - Strategic Flood Risk Assessment 2015